Back to Success Stories

Pakistan Aluminum Beverages Cans Ltd. (PABC)

Manufacturing - Beverage CansImplementation Duration: 7 months

Production of Beverage Cans & Supply Chain Management

Solutions Implemented

DAX ERP

The Challenge

High-speed production equipment needs to run constantly—any downtime is expensive

Raw material supply chain is complex—delays mean production stops

Equipment maintenance was reactive—broken machines caused urgent, expensive repairs

Beverage industry regulators have strict requirements—compliance tracking was manual

How We Did It

1

Built predictive maintenance scheduling so equipment is serviced before it breaks

2

Connected supply chain visibility so they know when materials are coming and can plan production

3

Created automated compliance tracking that stays in sync with regulatory requirements

4

Set up quality gates at each stage so defects are caught early, not at the end

The Results

Production Uptime

98%+

Quality Defects

0.5% reduction

Supply Chain Efficiency

35% improvement

What They Gained

Production uptime is 98%+ because equipment is maintained before it fails

Supply chain problems are caught early—minimal disruptions to production

Regulatory compliance happens automatically—no last-minute scrambling

Quality is high because defects are caught early in production

Operating costs dropped because they're doing preventive maintenance instead of emergency repairs

By the Numbers

Daily Production

5M+ cans

Production Lines

8

Quality Compliance

99.5%

Ready for Your Own Success Story?

Pakistan Aluminum Beverages Cans Ltd. (PABC) transformed their operations. So can you. Let's talk about what's possible for your business.